The Copper Valley Development is a mixed-use master-planned community located in the town of Copperopolis in the Foothills of the Sierra Nevada Mountains. The project is comprised of a total of over 2,300 existing and approved for sale residential units, an approved 233,000 SF Town Square with over 87,000 SF built and the majority of the infrastructure completed, and a full suiteof rental options/hotel rooms, all of which are fully entitled. The overall project spans just over 4,000 acres and includes approximately 5.5 miles of frontage along Lake Tulloch.
Copper Valley is located in the historic California “Gold Country” within a short drive of Angels Camp, Murphy’s, Columbia and Sonora. Additionally, Copper Valley is in the Lake Tulloch basin with endless outdoor activities within minutes of the property. Each neighborhood was designed with distinct cultural elements in mind contributing to a classical, wholesome feel throughout the development. The Golf Club at Copper Valley includes an acclaimed 18-hole golf course, ranked among California’s Top 50, including a newly remodeled 17,500 SF clubhouse, practice facility and a full-service fitness center. The Tuscany Hills portion of the development has 4.5 miles of direct shoreline access on Lake Tulloch, with an approval for 335 residential lots, a 27-boat marina and beach club, providing the development with direct access to one of California’s only full capacity reservoirs with year-round amenities. Tuscany Hills is immediately adjacent to Copper Valley Ranch with approximately 1.2 miles of frontage.
Mandarin Oriental
The Mandarin Oriental Las Vegas presents an investment opportunity in a hotel and residences project with a premier hospitality brand to be located in the heart of The Las Vegas Strip. 780 total units comprised of a 5 star, 326 room hotel with an additional 358 residential suites and 96 ultra-luxury private residences. Restaurants, clubs, retail space, a theater and a casino service visitors and residents alike. The Landowner will retain and operate the casino. The project will have a maximum allowable height of 720 feet and unobstructed, 360-degree views. Total cost is estimated to be 1.7 billion.
Aurelius, Las Vegas
Entertainment complex with hotel, casino, colonnades, restaurant, piano bars, water features, etc.
500MW data center hubs with commercial offices
Integrated green power system, HyGen STG for all complexes
No need for tapping into grid for power supply
Cooling Agent with closed circuit replacing water coolant system, eliminating water polutions
The ultra luxury mixed-use development shall be called The Aurelius Development
Three stratum titles:
NAIPP POWER PLANT/AI DATA CENTER
•950 MW (8,358,000 MW/h/y) Combined-cycle Gas-fired Power Plant in San Luis Rio Colorado, Sonora Mexico, that will generate clean energy with significant transmission in Mexico and US.
•Only private transmission line with direct interconnection to U.S.A. power grid (State of Arizona) with USPresidentialPermitgranted.
• Transmission structure allows North Branch to manage power flows between U.S. and Mexico delivering benefit for Mexico in energy pricing.
•Competitive market construction costs; use of proven advanced technologies.
•PPA from CFE(MX Utility) for 350 MW plus 300 MW in Mexico and 300 to export to US.
•Gas supply, gas pipeline connection, water supply studies complete (will require updates).
•Permitting substantially completed in Mexico and in the US.
•Total turnkey investment is $1BillionUSD.
•Power Island stranded equipment in storage ready to be sent to site to start construction .